Wednesday, August 11, 2010

Getting Close to Launch

I am excited to report that Le Pingouin has moved out of the shed. She is looking great and we are on our way to having the keel installed. Installing a canting keel into one of these boats is a very involved process. We’ve used hydraulic jacks to pump the keel up into the bottom of the boat. CMMC Machine has made some beautiful new stainless steel parts for us and all of their machine work looks to be spot on. The crew at Detyens Shipyard has once again proved they are real pros. After we get the keel affixed to the boat, we’ll move on to putting the rig together and getting this baby in the water. Enjoy the photos below!

Thanks for checking in,
Brad



3 comments:

  1. She looks great Brad - give me a four day head start to Bermuda and I'll make a race out of it with the Lung Ta!

    ReplyDelete
  2. She is a dream machine! Go Team

    Kevin and Camilla

    ReplyDelete
  3. She is a beauty Brad, congratulations to the Team.

    ReplyDelete